Project Name: relocation project of Hangzhou Xingjie Auto Parts Manufacturing Co., Ltd.
Project construction: No. 588, ZheYan Road, Hongshan Farm, Xiaoshan District.
Industry category: C3670 auto parts and accessories manufacturing
Construction scale: 500 thousand sets of auto parts per year
Second. Major environmental sensitive targets within the scope of environmental impact assessment.
Table 1 main environmental sensitive targets
Ordinal protection target position distance protection level
1. Hongshan Farm
Tongde Community On the southwest saide 37m concentrated residential area Environmental air class 2 acoustic environment class 2
2. Xianfeng River North Side 370m Width 20-25m Water Quality Class III
Third. The forecast of the main environmental impact
(1) the emission of this project is mainly the dust produced during shot blasting.
(2) no waste water is produced in this project. The main waste water produced is domestic sewage.
(3) noise equipment of this project is quenching machine, shot blasting machine, etc. the noise level is mainly 70~85dBA.
(4) The solid waste generated by this project is mainly waste scrap, collected dust, scrap metal cutting fluid, sewage treatment sludge and domestic garbage.
Fourth.The main environmental protection measures to be taken and the expected results
(1) the shot blasting dust produced by this project is discharged after being treated by the bag dust collector installed by the equipment.
(2) no process waste water is produced in the production process of the project, only for employees' domestic sewage. The domestic sewage is treated by septic tank, and then treated by the micro dynamic underground sewage treatment plant. After handling the standard, the water environment near the river is temporarily discharged.
(3) to choose equipment with advanced technology, good performance quality, low sound level in similar products, reasonable arrangement in the factory and production workshop, centralized layout of noise equipment, and arranged in the middle position of production workshop, repair and maintenance of mechanical equipment, avoid unnormal noise of equipment, and strengthen production management at the same time. Ensure that the noise of the factory can reach the standard.
(4) the comprehensive utilization of waste leftover materials and collected dust is sold in this project. The municipal solid waste and sewage sludge can be collected and disposed of by the local sanitation department at regular time. Waste metal cutting fluid is a dangerous solid waste, entrusted by qualified units for disposal.
Fifth. Preliminary conclusions of environmental impact assessment
As long as the enterprises effectively implement the pollution prevention measures proposed by the EIA, the impact of the project on the surrounding water environment, the atmospheric environment, the sound environment and the ecological environment are very small. It is feasible to say from the point of view of the environment.
Sixth. The scope and main issues of public opinion
The scope of soliciting opinions is mainly the surrounding enterprises and village residents of the project. The relevant public may publish individual or group opinions in written form and suggest that individuals should truthfully fill in the name and contact information. The entity should fill out the contact address and seal the seal to facilitate communication in the future.
Seventh. Time limit for soliciting public opinion
If the public has questions or opinions on the environmental issues of this project, it will be in contact with the construction unit, the environmental assessment unit or the environmental protection department from June 22, 2018 to July 5, 2018, ten working days (excluding holidays) from the date of this publication.
Eighth, the way of public opinion feedback
The public may submit opinions to the construction unit or the environmental impact assessment agency and the environmental protection administration responsible for examining and approving the environmental impact report in the form of letters, facsimile, e-mail or other means related to public notice after the information is open.
1. The situation of the construction unit
Name: Hangzhou Xingjie Auto Parts Manufacturing Co., Ltd.
Location: No. 588, ZheYan Road, Hongshan Farm, Xiaoshan District.
Contact name: Zhu Aifen contact telephone: 13967152283 zip code: 311200
2. The situation of the EIA unit
Unit name: Meike Group Hangzhou Environmental Protection Research Institute Co., Ltd.
Location: No. 288 arch Xiu Road, Xiaoshan District, Hangzhou.
Contact name: Xu Ling group contact telephone: 82754657 zip code: 311201
3. Project approval unit
Examination and approval unit: Xiaoshan District Environmental Protection Bureau
Contact: 0571-82899252, 82899253
Announcement: Hangzhou Xing Jie Auto Parts Manufacturing Co., Ltd.
Announcement time: June 22, 2018